How We Operate
1
The Rough/Prep
Planning phase of job (including selecting and ordering all finish products for your project):
Establish Scope of Work (Bid)
Select/Order all Finish Products
Review/Sign Contract
Jobsite Preparation
Jobsite Protection
Demolition/Tear Out
-All Finish Products must be present at jobsite before demo can begin ex: Cabinets/Tile/Flooring/ Plumbing & Electrical fixtures
2
The Build
Installation and construction of the following trades and building materials, which may include:
Framing
Rough Electrical/ Plumbing
Sheetrock
Cabinets
Hot Mop
Dry Wall Finishing
Doors/Windows
Roofing
Siding
Stucco
Concrete
“Pre-Wiring”
3
The Finish
Installation of finish product and trades, which may include:
Tile
Countertops
Flooring
Painting
Trim/Molding
Crown Molding
Base Board
Appliances
Mirrors
Shower Door
Plumbing Fixtures
Finish Electrical
Home Theater
Punch List
Final Walk Through